March 20, 2019
Ceco Partial update 7-17
SGLKD DU478 added, Welded base anchor correction. Was not appying to SJ.
4″ Head Refresh
Astragals ordered with door have been modified without hardware preps. Preps will be applied based upon preps applied to door
EXTRA HINGE preps modified. You must select as prep with EXTRA HINGE in the full description to include the “EXTRA COST” and to get the correct Qty of Hinges on Door and Frame
Glazing Bead corrected to per foot pricing. (Outlined by green box) You may need to select your glazing bead in Elevation Defaults to update changes
Full length pieces (Outlined in red box)
Astragals Ordered With Door