June 19, 2020
Republic partial update 8-6
Corrected Frame Prep 5″ STD/HVYWGT Each
Added additional KD component stick pricing to cut and notch
Added special finish preps to door paint table
Corrected DE combination adds for DL series
Corrected DL series insulated doors that were validating with 14ga
Added special size louver with call for pricing
Added installed louvers to preps
Revised Louver parts to only those available. Balance made OBSOLETE
Reminder when selecting doors with Lites or Louvers that may require preps
1. Select door type Example: LI Louver Door
2. Select required cutout/installation option and enter any properties
3. Other options to select would be Galv and Fusible Link